This project includes the complete gut-renovation of the existing 18,000 s.f. science wing of Westwood Regional Jr./Sr. High School.


The existing area contained 8 science labs.  This area was redesigned with more efficient space planning to add one additional science lab, thus increasing the amount of instructional space in the already crowded school.


The renovations included 3 biology labs, 2 physics labs, 2 chemistry labs, and 2 earth science labs.  Three prep rooms, instructors offices, storage spaces and restroom renovations were also included in this project.



Westwood Jr./Sr. Regional High School

Click on image to see all pictures

Science Wing Rehabilitation

This project includes the complete renovation of the existing Campbell Auditorium at Westwood Regional Jr./Sr. High School.


The renovations included a complete lighting and rigging replacement with a new electronic dimming system.


House lighting and auditorium finishes were replaced to upgrade and modernize the auditorium.


Lighting was designed to be dimmable in multiple stages for different scenarios such as study hall, lectures, performances and concerts.  A new lighting and sound control booth was added to the rear of the auditorium.



Auditorium Rehabilitation

OAKLAND

306 Ramapo Valley Road, Oakland, NJ 07436