Town of Newton: New Firehouse No. 2

This project includes the demolition and removal of the existing Firehouse No. 2 the site development and construction of the New Firehouse No. 2 and all associated work as shown on the Construction Documents. Contractors interested in visiting the site in person may make arrangements with Mr. Thomas S. Russo, Jr., Town Manager, @ 973-383-3521.

Kinnelon BOE: Floor Settlement Repairs @ Kinnelon HS & Pearl Miller MS

This project includes the removal of floor finishes, concrete floor slabs, the repairs to plumbing lines, compaction of soil and crushed stone, and the installation of new concrete floor slabs along with floor finishes, and all associated work as shown on the Construction Documents.   Contractors interested in visiting the schools in person may make… Continue reading

Westwood Regional BOE: Brookside ES Roof Replacement

This project includes the replacement of approximately 30,000 s.f. of built-up roofing system down to the structural deck with new multi-ply, built up roof with Modified Bituminous Capsheet.  This work includes all flashings, trim, details, metalwork and metal mansard and soffit system and all other work as shown on the drawings and specified herein.   >>CLICK… Continue reading

Westwood Regional BOE: New Maintenance Building

This project includes the construction of a new Maintenance Building on the site of the Westwood Regional Jr./Sr. High School of approximately 10,300 s.f.  The structure will be a Steel framed building with concrete masonry unit walls.  Contract to include all general construction, structural, mechanical, electrical, plumbing, site work, and all other associated work, etc.… Continue reading

Hanover Park BOE: Whippany Park HS Field Lighting Installation

This project consists of the installation of new field lighting at Whippany Park High School, including new electrical service, light poles, foundations, conduit, wire, fixtures, programming and all work specified and shown on the drawings, etc.   <<CLICK HERE FOR RESULTS>>