Caldwell/West Caldwell: Dust Collection Systems for James Caldwell HS

This project includes removing two(2) existing dust collection systems and installing two(2) new dust collection systems along with all associated items as indicated on the Construction documents. Contractors interested in visiting the school in person may make arrangements with Mr. Frank Ennis, Director of Buildings & Grounds @ 973-650-0465.

Caldwell/West Caldwell: Water Infiltration Project at Wilson ES

This project includes excavation along a portion of the building to install a new foundation waterproof membrane, drainage mat, drain, and backfilling as shown on the Construction documents. Contractors interested in visiting the school in person may make arrangements with Mr. Frank Ennis, Director of Buildings & Grounds @ 973-650-0465.

Westwood BOE: Westwood HS & George ES Window Replacements

Corridor Window Replacement at Westwood Regional Jr./Sr. HS: Replacement of existing corridor curtainwall and precast panel system with new curtainwall, new framing and terra-cotta panels, doors and all associated work as shown on the drawings and specified herein. Multi-Purpose Room Window Replacement at Jessie George ES: Replacement of existing Multipurpose Room curtainwall with new curtainwall,… Continue reading

Morris Hills BOE: Morris Knolls Middle Field Refurbishment

This project consists of the refurbishment of the existing “Middle Field” at Morris Knolls High School, including new multi-sport artificial turf field, field equipment, bleachers, parking lot, sidewalk, site lighting, drainage, utilities, and all associated work as shown on the drawings and as specified.