Morris Hills BOE: Morris Knolls Middle Field Refurbishment

This project consists of the refurbishment of the existing “Middle Field” at Morris Knolls High School, including new multi-sport artificial turf field, field equipment, bleachers, parking lot, sidewalk, site lighting, drainage, utilities, and all associated work as shown on the drawings and as specified.

Westwood BOE: Brookside ES Partial Roof Replacement, Phase 3

This project includes the replacement of approximately 15,200 s.f. of built-up roofing system down to the structural deck with new multi-ply, built up roof with Modified Bituminous Capsheet.  This work includes all flashings, trim, details, metalwork and all other work as shown on the drawings and specified herein.

Morris Hills BOE: Morris Hills HS Partial Roof Replacement

This project consists of the removal and replacement of existing built-up roofing systems at Morris Hills High School and all flashings, trim, associated work, etc.  Approximate square footage is approx. 18,500 s.f. (note that this is for informational purposes only, contractor shall prepare their own quantity take-offs and estimate).