This project includes excavation along a portion of the building to install a new foundation waterproof membrane, drainage mat, drain, and backfilling as shown on the Construction documents.
Contractors interested in visiting the school in person may make arrangements with Mr. Frank Ennis, Director of Buildings & Grounds at 973-650-0465.