This project consists of the replacement of the existing Main Gym and Auxiliary Gym H&V units with new rooftop HVAC units at Morris Hills High School.  This work also includes the removal/replacement/installation of all associated steel reinforcing and dunnage, ductwork, piping, electric, and all associated work as shown on the drawings and as specified, etc.

Bid Due Date

January 17, 2018     2:00 pm Joann Gilman Auricchio Business Administrator Morris Hills Regional District Board of Education 48 Knoll Drive, Rockaway, NJ 07866

Pre–Bid Meeting & Walk–Through

December 14, 2017     3:00 pm Morris Hills High School Lobby 520 Main Street, Rockaway, NJ 07866

Bid Package

$100.00 + additional $25.00 if mailing is requested CASH, CERTIFIED CHECK or MONEY ORDER ONLY payable to FKA Architects.

Plan Holder’s List

Contractors

TEO Technologies 973-728-6166
Liberty Mechanical 973-344-6131
GMT Contracting 201-459-6313
Amco 908-241-4177
Direct Digital Control Systems 973-257-3011
EACM Corp. 732-842-4777
Iron Mountain Mechanical 908-496-4792
C. Dougherty & Co. 973-742-8100
K&D Contractors 908-709-1268
Industrial Cooling Corp 732-744-9200
Framan Mechanical 732-661-0001
Centralpak Engineering 973-625-9230
Thassian Mechanical 732-787-3300
See all bids: Go to Bids Archive