This project includes the excavations along the front of the building for the installation of foundation waterproofing, drainage mat, new drainage system, and backfilling, as shown on the Construction Documents. PLEASE NOTE, plans may not be picked up in person. Please mail us your check, call us at 201-644-0505 x200 or email at info@fkarch.com to… Continue reading
Archive of bids
Caldwell/West Caldwell: Dust Collection Systems for James Caldwell HS
This project includes removing two(2) existing dust collection systems and installing two(2) new dust collection systems along with all associated items as indicated on the Construction documents. Contractors interested in visiting the school in person may make arrangements with Mr. Frank Ennis, Director of Buildings & Grounds @ 973-650-0465.
Caldwell/West Caldwell: Water Infiltration Project at Wilson ES
This project includes excavation along a portion of the building to install a new foundation waterproof membrane, drainage mat, drain, and backfilling as shown on the Construction documents. Contractors interested in visiting the school in person may make arrangements with Mr. Frank Ennis, Director of Buildings & Grounds @ 973-650-0465.
Eastern Christian Children’s Retreat: Security Upgrades at Various Facilities
This project includes the installation of security cameras, and access control devices in various locations, at The Bushman Building, The Home at 116 Hillside Ave, Holly Lodge, Oak Lodge, & Willow Lodge, and all associated work as shown on the Construction Documents. Contractors interested in visiting the various facilities in person may make arrangements with… Continue reading
Westwood BOE: Westwood HS & George ES Window Replacements
Corridor Window Replacement at Westwood Regional Jr./Sr. HS: Replacement of existing corridor curtainwall and precast panel system with new curtainwall, new framing and terra-cotta panels, doors and all associated work as shown on the drawings and specified herein. Multi-Purpose Room Window Replacement at Jessie George ES: Replacement of existing Multipurpose Room curtainwall with new curtainwall,… Continue reading
Morris Hills BOE: Morris Knolls Middle Field Refurbishment
This project consists of the refurbishment of the existing “Middle Field” at Morris Knolls High School, including new multi-sport artificial turf field, field equipment, bleachers, parking lot, sidewalk, site lighting, drainage, utilities, and all associated work as shown on the drawings and as specified.