High Bridge BOE: High Bridge ES Water Infiltration Project

This project includes the excavations along the front of the building for the installation of foundation waterproofing, drainage mat, new drainage system, and backfilling, as shown on the Construction Documents. PLEASE NOTE, plans may not be picked up in person.  Please mail us your check, call us at 201-644-0505 x200 or email at info@fkarch.com to… Continue reading

Caldwell/West Caldwell: Dust Collection Systems for James Caldwell HS

This project includes removing two(2) existing dust collection systems and installing two(2) new dust collection systems along with all associated items as indicated on the Construction documents. Contractors interested in visiting the school in person may make arrangements with Mr. Frank Ennis, Director of Buildings & Grounds @ 973-650-0465.

Caldwell/West Caldwell: Water Infiltration Project at Wilson ES

This project includes excavation along a portion of the building to install a new foundation waterproof membrane, drainage mat, drain, and backfilling as shown on the Construction documents. Contractors interested in visiting the school in person may make arrangements with Mr. Frank Ennis, Director of Buildings & Grounds @ 973-650-0465.