Morris Hills BOE: Morris Knolls Middle Field Refurbishment

This project consists of the refurbishment of the existing “Middle Field” at Morris Knolls High School, including new multi-sport artificial turf field, field equipment, bleachers, parking lot, sidewalk, site lighting, drainage, utilities, and all associated work as shown on the drawings and as specified.

Morris Hills BOE: Morris Knolls Middle Field Refurbishment

This project consists of the refurbishment of the existing “Middle Field” at Morris Knolls High School, including new multi-sport artificial turf field, field equipment, bleachers, parking lot, sidewalk, site lighting, drainage, utilities, and all associated work as shown on the drawings and as specified.

Westwood BOE: Brookside ES Partial Roof Replacement, Phase 3

This project includes the replacement of approximately 15,200 s.f. of built-up roofing system down to the structural deck with new multi-ply, built up roof with Modified Bituminous Capsheet.  This work includes all flashings, trim, details, metalwork and all other work as shown on the drawings and specified herein.