Caldwell/West Caldwell BOE: James Caldwell HS Mechanical Replacement Project

This project includes the removal, upgrades, and replacements of Mechanical units, items, etc. and all associated work as shown on the Construction Documents. Contractors interested in visiting the school in person may make arrangements with Mr. Frank Ennis, Director of Buildings & Grounds @ 973-650-0465

REBID – Township of Newton Firehouse No. 2

This project includes the construction of the New Firehouse No. 2 and all associated work as shown on the Construction Documents. Contractors interested in visiting the site in person may make arrangements with Mr. Thomas S. Russo, Jr., Town Manager, @ 973-383-3521.

Morris Hills Regional District: Morris Hills HS Gym HVAC Replacement Project

This project consists of the replacement of the existing Main Gym and Auxiliary Gym H&V units with new rooftop HVAC units at Morris Hills High School.  This work also includes the removal/replacement/installation of all associated steel reinforcing and dunnage, ductwork, piping, electric, and all associated work as shown on the drawings and as specified, etc.

Lakeland Regional HS: East Building Air Conditioning Upgrade Project

This project includes the installation of new air conditioning units and HVAC equipment, as well as the replacement and/or modification of select HVAC equipment at Lakeland Regional High School in Wanaque, NJ.   ADDENDUM No. 1:  November 30, 2017 ADDENDUM No. 2:  December 07, 2017

Town of Newton: New Firehouse No. 2

This project includes the demolition and removal of the existing Firehouse No. 2 the site development and construction of the New Firehouse No. 2 and all associated work as shown on the Construction Documents. Contractors interested in visiting the site in person may make arrangements with Mr. Thomas S. Russo, Jr., Town Manager, @ 973-383-3521.

Kinnelon BOE: Floor Settlement Repairs @ Kinnelon HS & Pearl Miller MS

This project includes the removal of floor finishes, concrete floor slabs, the repairs to plumbing lines, compaction of soil and crushed stone, and the installation of new concrete floor slabs along with floor finishes, and all associated work as shown on the Construction Documents.   Contractors interested in visiting the schools in person may make… Continue reading