Corridor Window Replacement at Westwood Regional Jr./Sr. HS:

Replacement of existing corridor curtainwall and precast panel system with new curtainwall, new framing and terra-cotta panels, doors and all associated work as shown on the drawings and specified herein.

Multi-Purpose Room Window Replacement at Jessie George ES:

Replacement of existing Multipurpose Room curtainwall with new curtainwall, steel reinforcement, framing and terra-cotta panels (alternate), and all associated work as shown on the drawings and specified herein.

Bid Due Date

January 14, 2020     2:00 pm Keith Rosado Business Administrator Westwood Regional Board of Education 701 Ridgewood Road, Township of Washington, NJ 07676

Pre–Bid Meeting & Walk–Through

None

Bid Package

$100.00 + additional $25.00 if mailing is requested CASH, CERTIFIED CHECK or MONEY ORDER ONLY payable to FKA Architects.

Plan Holder’s List

Contractors

Construct Connect 800-364-2059
Pro Architectural LLC 862-290-2285
Panoramic Window 732-926-0900
APS Contracting 973-754-1980
D&E Windows 908 903 1900
See all bids: Go to Bids Archive