Westwood BOE: Brookside ES Partial Roof Replacement, Phase 3

This project includes the replacement of approximately 15,200 s.f. of built-up roofing system down to the structural deck with new multi-ply, built up roof with Modified Bituminous Capsheet.  This work includes all flashings, trim, details, metalwork and all other work as shown on the drawings and specified herein.

Morris Hills BOE: Morris Hills HS Partial Roof Replacement

This project consists of the removal and replacement of existing built-up roofing systems at Morris Hills High School and all flashings, trim, associated work, etc.  Approximate square footage is approx. 18,500 s.f. (note that this is for informational purposes only, contractor shall prepare their own quantity take-offs and estimate).

Morris Hills BOE: Morris Hills HS Visitor Bleacher Replacement

This project consists of the construction and installation of new steel and aluminum visitor bleachers (approx. 610 person capacity). This includes site work, concrete footings, pavement and all other associated work as shown on the drawings and specifications, etc. at Morris Hills High School.

Montvale BOE: Memorial ES Multi Purpose Room Roof Replacement

This project includes the replacement of the existing roof over the Multi-Purpose Room at Memorial Elementary School with a new, built up asphalt roof system and all flashings, accessories, and all other associated work as shown on the drawings and specified herein, etc.

Caldwell/West Caldwell BOE: Harrison School Renovations

This project includes installing toilets in existing classrooms as well as additional Alternates. Contractors interested in visiting the school in person may make arrangements with Mr. Frank Ennis, Director of Buildings & Grounds @ 973-650-0465.

Westwood Regional BOE: Westwood Reg. Middle School Additions & Alterations Project

This project includes the construction of new additions of approximately 50,000+ s.f.  The structure will be a Steel framed building with concrete masonry unit walls and brick, curtainwall, panel exterior.  Contract to include all general construction, structural, mechanical, electrical, plumbing, fire protection, site work, and all other associated work as shown on the drawings and… Continue reading

West Milford BOE: West Milford HS Grandstand Replacement Project

This project includes the removal and replacement of the existing aluminum and steel grandstand with masonry/wood framed press box with new aluminum and steel grandstand with pre-fabricated pressbox and all associated work, etc. at McCormack Field, West Milford High School.

Westwood BOE: WRMS A-Field Parking Lot Construction

This project includes the construction of a new 52 space parking lot at the A-Field at Westwood Regional Middle School, including all site construction, paving, concrete, curbing, landscaping, site lighting and all other associated work, etc.  This work is schedule to begin immediately upon award and occur fall of 2018.