Westwood Regional BOE: Brookside ES Roof Replacement

This project includes the replacement of approximately 30,000 s.f. of built-up roofing system down to the structural deck with new multi-ply, built up roof with Modified Bituminous Capsheet.  This work includes all flashings, trim, details, metalwork and metal mansard and soffit system and all other work as shown on the drawings and specified herein.  

Westwood Regional BOE: New Maintenance Building

This project includes the construction of a new Maintenance Building on the site of the Westwood Regional Jr./Sr. High School of approximately 10,300 s.f.  The structure will be a Steel framed building with concrete masonry unit walls.  Contract to include all general construction, structural, mechanical, electrical, plumbing, site work, and all other associated work, etc.

Hanover Park BOE: Whippany Park HS Field Lighting Installation

This project consists of the installation of new field lighting at Whippany Park High School, including new electrical service, light poles, foundations, conduit, wire, fixtures, programming and all work specified and shown on the drawings, etc.   <<CLICK HERE FOR RESULTS>>

Morris Hills Regional BOE: Academy Classroom Renovation Project

This project consists of the limited renovation of five classrooms at Morris Hills High School.  This includes the construction of a subdividing partition and door, gas and water fixtures for Science labs, and Safety Stations for Science work and all associated work, etc. as shown on the drawings and specifications.   Contract work may start… Continue reading

Morris Hills Regional BOE: Morris Hills Academy Roof Replacement

This project consists of the removal and replacement of existing built-up roofing system at the Morris Hills High School Academy Building, including all flashings, trim, associated work, etc.  Approximate square footage is 17,500 s.f. (note that this is for informational purposes only, contractor shall prepare their own quantity take-offs and estimate).   Contract work may… Continue reading

Morris Knolls HS: Window Replacement Project

This project consists of the removal and replacement of existing aluminum and glass window, storefront systems, doors, and associated sills, metal trim, and all other work as shown on the drawings and specifications.   << CLICK HERE FOR RESULTS >>

Westwood BOE: Westwood HS Gym Floor Replacement

This project includes the complete replacement of the existing wood floor and subfloor with a new wood gymnasium flooring system, complete with all accessories, transitions, removal and re-installation of bleachers, and all associated work, etc.   << CLICK HERE FOR RESULTS >>

Morris Hills HS Tennis Court Refurbishment Project

This project consists of the refurbishment of the existing (5) tennis courts at Morris Hills High School.  This work consists of replacement of the existing chain link fencing, the construction of a new, post-tensioned, concrete slab tennis courts, coating, nets, fencing, gates, and surrounding paving and drainage work, and all work as shown on the… Continue reading

Morris Hills HS Field House Replacement Project

This project consists of the replacement of the existing field house at Morris Hills High School.  This work generally includes the demolition of the existing field house and construction of a new 1,800 s.f. +/-  field house building including concession area, restrooms and storage room and all associated site and utility work as shown on the… Continue reading

Caldwell/West Caldwell BOE: Mechanical Upgrade Project @ Lincoln ES

This project includes the removal, upgrades, and replacements of Mechanical Service items, etc. and all associated work as shown on the Construction Documents. Contractors interested in visiting the schools in person may make arrangements with Mr. Frank Ennis, Director of Buildings and Grounds at 973-650-0465.